Ridge House completed pool project
Case 03 / Equipment care + automation

Ridge House

Beverly Hills, CA2025
01 The brief

A high-spec equipment room had become difficult to operate, with conflicting schedules, noisy flow and unreliable remote control.

Response

NIVORA simplified the hydraulic logic, recommissioned automation and created a clear operating baseline for the entire system.

Ridge House work in progressProcess / documented on site
02 / Decisions

Every visible result begins below the surface.

  1. 01Unified automation logic
  2. 02Variable-speed calibration
  3. 03Hydraulic noise reduction
  4. 04Documented operating baseline
03 / Measured outcome

Quiet, predictable operation with one concise control strategy.

42%less daily runtime
3systems unified
1.8 dBreduced pump noise
Ridge House technical detail
04 / Stewardship
“The final measure is not how the pool looks on completion day, but how quietly it performs after the team has left.”

NIVORA operating principle

Next caseCanyon Residence
A considered first step

Let the water become the quietest part of the property.

Request a private assessment

One thoughtful call. No pressure. No shared details.

Ridge House pool project — NIVORA Poolworks